by: Ron Bloom
09/14/2020
0
This week finds continued work on the property as our
site contractor gets the parking and roadway areas ready
for paving. We have now obtained power on the modular
complex. Working on removing children’s water fountains,
fixing roof leaks, testing out the electrical and Air Conditioners
on the modulars. Continuing work on the hanging ceiling grids
in the office and children’s area. Primer coat is being applied to
walls in the children’s area and the office complex. Texture being
applied to the outside trim area of the building and the underside
of the drive thru. The wing walls are up in the sanctuary. They are
sheet rocking as well. The audio/video system hardware is being
hung in the ceiling of the sanctuary. Sod was being placed in the
Pond #2. Glass panels are being placed in the front and rear
sections of the main building.
- Richard
0 Comments on this post: