8/23/20 Project Update

Services

Sunday -8:30AM Legacy Traditional Service | 9:45 AM COnnection Groups | 11:00 Journey Contemporary Worship Service | 6:00 pm Evening Service | Wednesday 6:30 PM Prayer meeting

by: Ron Bloom

08/23/2020

0

This week has seen a lot of change on the property. Millenium Electric continues to setup the power system that connects with the modular complex. Our next action is to obtain inspections by both the City of Clermont and our power company Sumter Electric. The steel decking for the platform has been completed. Requested inspections so that we can pour the concrete on the decking next week. Sealing up the joints on the wallboard in both the children’s area and the office complex.

Steps and ramps for the modular complex have initiated construction. Low voltage wiring for the main building continues to be installed by our audio-visual contractor. The building has reached the point where it becomes necessary to secure all the entrances to protect all of the internal items within the building. We are missing both the main power panel for the building as some of the glass panels for the front and back of the building. So far it is not impacting our overall schedule.

- Richard Combs

Below is our video for the week.

https://vimeo.com/450334553/4db40c7856

This week has seen a lot of change on the property. Millenium Electric continues to setup the power system that connects with the modular complex. Our next action is to obtain inspections by both the City of Clermont and our power company Sumter Electric. The steel decking for the platform has been completed. Requested inspections so that we can pour the concrete on the decking next week. Sealing up the joints on the wallboard in both the children’s area and the office complex.

Steps and ramps for the modular complex have initiated construction. Low voltage wiring for the main building continues to be installed by our audio-visual contractor. The building has reached the point where it becomes necessary to secure all the entrances to protect all of the internal items within the building. We are missing both the main power panel for the building as some of the glass panels for the front and back of the building. So far it is not impacting our overall schedule.

- Richard Combs

Below is our video for the week.

https://vimeo.com/450334553/4db40c7856